THUNDERBOLT TWIN-TUBE MONORAIL
An excellent choice for THUNDERBOLT Recoilless Hammer suspension where floor space is limited and larger mills need to be relined.
The THUNDERBOLT Twin-Tube Monorail is an excellent choice for THUNDERBOLT Recoilless Hydraulic Hammer suspension where adequate floor space is not available and larger mills are to be relined.
Unlike the conventional “I” beam style monorail, the twin-tube design ensures trouble-free operation for long periods even in extremely dusty environments. When used together with the THUNDERBOLT Twin-Tube Monorail Winch, crews will have raise and lower functionality at their fingertips. When used with the THUNDERBOLT Pneumatic Monorail Winch, the raise lower function is controlled by a separate pendant.
THUNDERBOLT Twin-Tube Monorail system is custom-engineered to exacting standards to suit your specific mill requirements.
Benefits
- Accessibility – Well-suited to large mills with poor access
- Reliable – Tubular design means reliable performance and reduced maintenance
- Compatibility – With different THUNDERBOLT Hammers and THUNDERBOLT Power Packs
- Control – Direct winch control can be done from the THUNDERBOLT Recoilless Hammer
- Versatile – Supports the suspension of other site tools such as a pneumatic wrench for improved safety and productivity
- Contoured – Allows the trolleys to 'roll' with the arc of hammer sweep as the bolt is knocked in
ADDITIONAL INFORMATION
-
- Due to the tubular rail design, dust cannot settle on the curved surface where the uniquely-designed monorail trolley wheels run
- The larger 150mm tube is used for hammer suspension using 600kg capacity trolleys
- The slightly smaller 80mm tube is used for other relining tool suspension using 250kg capacity trolleys
- Beneficial for THUNDERBOLT Recoilless Hammer suspensions where liner bolts are short, such as along the shell of larger SAG and Ball Mills and the ends of Ball Mills
- Hydraulic winch is powered from the THUNDERBOLT Hydraulic Power Pack
- Custom-engineered according to the appropriate monorail offset to the mill shell and the appropriate monorail height.
- Easy site installation utilising RME or local maintenance resources
-
- The THUNDERBOLT Twin-Tube Monorail is for overhead suspension of THUNDERBOLT Recoilless Hammers during the knock-in phase of concentrator mill relining
- The THUNDERBOLT Twin-Tube Monorail Suspend other tools including pneumatic wrenches
RME is the world’s leading Original Equipment Manufacturer (OEM) of mill relining systems.
RUSSELL MRMs engineered, manufactured and delivered.
THUNDERBOLT Recoiless Hammers sold.
Mine sites served by RME assets & services.
Related products
THUNDERBOLT MAGNUM 2000
The mighty THUNDERBOLT MAGNUM 2000 is the industry’s most powerful recoilless hammer, delivering the ultimate in impact energy per blow.
Read MoreTHUNDERBOLT MAGNUM 1000
The THUNDERBOLT MAGNUM 1000 is the industry's most productive hammer yet. It's high-energy rapid-fire rate will shorten knock-in times and improve operator safety.
Read MoreTHUNDERBOLT ELEVATING PLATFORMS
Give your crews greater, and ergonomically-safer, reach outside the mill. Plus they're field-upgradable to THUNDERBOLT SKYPORT.
Read MoreTHUNDERBOLT SKYPORT
Portable and modular, THUNDERBOLT SKYPORT is the lift-in version of the fixed plant THUNDERBOLT SKYWAY, RME's semi-automated knock-in technology.
Read MoreTHUNDERBOLT SKYWAY
THUNDERBOLT SKYWAY roboticises the operation of THUNDERBOLT Hammers to vastly improve knock-in speed and safety – consistently, repeatably, sustainably.
Read More